Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://wavesocialmedia.com/story6323495/the-penmann-team-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-liverpool-site-supporting-fsi-phase-1-2