The PIF is held within the place of selling and includes all documentation related to the protection, testing and formulation with the product. In combination with the CPSR , the PIF generally contains: (e) In the event the Contractor receives the Contracting Officer’s final determination of material weaknesses, the Contractor https://contractorpurchasingsyste65375.thenerdsblog.com/39496653/about-cpsr